Project: Intermune
Site: Brisbane, CA
Provided facility space expansion to adjacent building.
Installed category-5e system solution for approximately
80 designated end-users.
Multi-pair copper riser ties for demarcation.
Provided "Universal" connectivity cabling solution
for plug & play capabilities.
Provided IDF closet build-out consisting of two racks, runway
and associated components.
Installation provided within an unoccupied existing furniture
and office environment.
Provided universal PBX extensions in coordination with customers
vendor.
Provided cable certification.
Project Cabling Cost: $23,858.00
Project Construction Schedule:
Start: 1/27/05
Complete: 2/7/05
Project: McGraw Hill
Site: 20 Ryan Ranch Road
Provided phase-1 installation of a scheduled 16 phase campus environment
"Structured Cabling Overhaul" for McGraw Hills Monterey
facility.
Designed and built cabling infrastructure consisting of
the following: pathways, support systems, MDF/IDF layout, new data
center build-out, backbone fiber/copper cabling, server resource
ties, rack/runway design & high speed data connections.
Multi-pair copper trunk/PBX ties.
Provided "Universal" category-6 Avaya/Systimax
cabling solution for approximately 300 workstations.
Provided color-coding and label identifier scheme for easy
facility management.
Provided final connections for all high speed data circuits.
Provided around the clock labor for cut-over services.
Provided fiber, data, voice patching to complete end to
end connectivity.
Provided cable certification & as-built documentation.
Project Cabling Cost Approximately: $400,000.00
Project Construction Schedule:
Start: 10/4/04
Completion: 12/28/05
Project: Brown & Toland
Site: 153 Townsend Street-7th & 6th floors
Provided cable infrastructure for Brown & Tolands new
San Francisco based facility. The project space consisted of 140,000
square feet of new construction. As part of the construction team,
McMillan Data Communications assisted in preliminary budgets, design
and final installation consisting of the following:
Provided Panduit universal "Plug & Play"
connectivity solution for approximately 500 end users.
Installed 350,000 feet of high speed category-6 cable in
a 4 week "rough-in schedule".
Designed, configured and built data center and three IDF
closets which included cabinet and rack installation, overhead ladderack,
patch panel configuration, complete system grounding and cabinet
resource ties.
Installated copper, DS-3 coax and fiber backbone applications.
Installed TV and A/V required cabling.
Provided certified test results, as-built documentation
and labeling schematic.
Project Cabling Cost Approximately: $300,000.00
Project Construction Schedule:
Start: 3/27/03
Completion: 7/10/03
Project: McKesson Corporation
Site: One Post Street
Floors 11, 12, 18, 19, 20, 22, 23, 28, 29, 30, 31, 32, 33, 34 &
36
McMillan Data Communications recently completed McKesson Corporations
15 floor re-stack project at One Post Street in San Francisco. We
were directly under contract with McKesson in coordination with
Skyline Partners. This MDC design & build project was, at the
time, acknowledged as one of San Franciscos largest tenant
improvement projects. We designed the following cable infrastructure
together with McKessons IT department:
Provided a Panduit/Belden high speed 350Mhz bonded connectivity
solution.
Each floor consisted of approximately 100 end users (three
cables per outlet).
Universal distribution in a modular jack panel was used
for flexibility for voice and data applications.
Provided fiber backbone for data applications, copper backbone
"multi-conductor" for voice/PBX capabilities and cat-5
backbone for data circuit interconnections.
Designed and built all telecom rooms including racks, runway,
cable management and equipment grounding.
Provided system color-coding for all outlet identification
and cable.
Provided design drawings and cable certification.
Project Cabling Cost Approximately: $800,000.00
Project Cabling Schedule:
Start: 1/30/03
Completion: 11/30/04

|